And if you happen to be at home when that happens, it becomes far more likely that you’ll be the victim of not only property crime, but a violent crime. Predictive analytics compiled by warn us that over the next 20 years, a mindblowing 75% of the homes in America will be subject to a break-in. Statistically speaking, yes, having a safe room is that important. So how do you build a safe room on a budget? And is it really that important? One way to prevent the possibility of being a victim of violence in your own home is to prepare a space to which you can retreat if someone breaches your door. Heating, Ventilating, and Air Conditioning (HVAC).Home invasions are on the rise in the United States, often resulting in extreme violence. The method of Contractor Selection has not been determined at this time. The City of Panama City Beach is an Equal Opportunity Employer. Each Statement of Qualifications shall be valid to the City for a period of ninety (90) days after opening. All formal inquiries regarding this RFQ should be directed in writing to Carrie Jagers, Purchasing Manager or via email to The City reserves the right to accept or reject any and all SOQs in whole or in part, to waive informalities in the RFQ documents, to obtain new SOQs, or to postpone the opening of SOQs, or if unable to negotiate a satisfactory contract to terminate all negotiations under the RFQ and proceed by whatever appropriate means it may elect. The City Hall's time stamp shall be conclusive as to the timeliness of receipt. Any sealed bid submitted on paper must identify and clearly mark the bid # PCB22-37 RFQ A/E SERVICES - FRANK BROWN PARK COMMUNITY CENTER ANNEX - SAFE ROOM on the package.Receipt of a bid by any Panama City Beach Office, Receptionist, or personnel other than the City Hall's front desk does not constitute "receipt" as required by this solicitation. Alternatively, one original and five copies along with a CD or flash drive are to be delivered to the City Hall Office at the address below. City is under no obligation, either express or implied, to reimburse responding firms for any expenses associated with preparation and submittal of the Statement of Qualifications in response to this request. A significant percentage of this project is being funded with Hazard Mitigation Grant Program (HMGP) grant funds and the A/E firm will be subject to all related compliance matters during the course of the project. Minimum design wind speed will be 200 mph. The project shall be designed by the criteria contained in the standards of the Department of Homeland Security, Federal Emergency Management guidance manual P-361, Design and Construction for Community Safe Room, to provide near-absolute protection to occupants during and after extreme weather events. The building shall be configured to allow for recreational use as well. Community Center Annex which will also serve as a stand-alone safe room to provide short term shelter for approximately 2,100 people. DESCRIPTION OF WORK: Provide planning, design and construction administration services for construction of a new approximately 15,600 s.f. The building will be located at 16200 Panama City Beach Parkway within the existing Frank Brown Park complex. *The closed solicitation has been included below for reference: The City of Panama City Beach (the City), under the provisions of Section 287.055, Florida Statutes (the Consultant's Competitive Negotiation Act), hereby gives notice that a Request for Qualifications for professional services is invited from qualified architectural and engineering firms or teams to provide architectural and engineering design services related to the construction of a new Community Center annex which will also serve as a stand-alone safe room for hurricanes and/or tornado events. A firm timeline for construction has not been established. Nationwide Architect and Engineering IDIQ - Small Business PoolĪs of January 6, 2023, information regarding the award and award date has not been disclosed. Unrestricted Architect-Engineering Airfield Paving Design MATOC Professional Services for SRF Projects - General EngineersĪrchitect-Engineer Supplemental Services - Southeast Regional Office Professional Services for Panama City SRF Projects - General Engineer(s) - Continuing BasisĬ-Commissioning Authority (CXA) Services for the EPA Renovation and Construction Management of One BuildingĬ-A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide. Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts RFQ - Continuing Professional Services Contract
0 Comments
Leave a Reply. |